Which coordination inputs should be registered?

Use vendor outlines, room backgrounds, structural or architectural references, cable routes, access requirements and the approved drawing standard.

Electrical room GA
InputCoordinationStatus
EquipmentOutline and tagVendor revision
RoomBoundary and doorsApproved background
AccessMaintenance pathProject requirement
CablesEntry and routeInterface register
SectionsElevation and referenceDrawing list

Sources: Telecommunications Industry Association: ANSI/TIA-942 Telecommunications Infrastructure Standard for Data Centers, National Fire Protection Association: NFPA 70, National Electrical Code

How should a room conflict be shown?

Mark the affected equipment, source, missing decision and reviewer. Do not use a generic clearance or room dimension as a substitute for project coordination.

  • Equipment geometry
  • Room boundary
  • Access
  • Cable interface
  • Open dimension

What does the GA check cover?

It covers consistency of supplied inputs, tags, references, dimensions and revision. Engineering approval remains separate.

Common questions

What else should the bid team know?

What should a data center electrical room GA include?

It should show equipment, room, access, cables, elevations, tags and source status.

Who reviews a data center electrical room GA?

The drafter coordinates the drawing and the responsible engineer approves the design basis.

Does drafting approve the critical power design?

No. The responsible registered engineer makes design decisions and performs engineering sign-off.

Primary sources

  1. ANSI/TIA-942 Telecommunications Infrastructure Standard for Data CentersTelecommunications Industry Association
  2. Tier Standard: TopologyUptime Institute
  3. NFPA 70, National Electrical CodeNational Fire Protection Association
  4. NFPA 110, Standard for Emergency and Standby Power SystemsNational Fire Protection Association