What should be retained?
Keep the completed checklist with the handover index and source register. An unchecked item should become an assigned action.
| Area | Evidence | Owner |
|---|---|---|
| Files | Native and PDF set | Drafter |
| Source | Input register | Document control |
| Review | Comment disposition | Engineer |
| Status | Approval route | Project team |
Common questions
What else should the bid team know?
Does this checklist approve construction?
No. It checks handover readiness only.
Are files uploaded by the tool?
No. It runs in the browser.
Who approves the design?
The responsible registered engineer on the project.
Primary sources
- ANSI/TIA-942 Telecommunications Infrastructure Standard for Data CentersTelecommunications Industry Association
- Tier Standard: TopologyUptime Institute
- NFPA 70, National Electrical CodeNational Fire Protection Association
- NFPA 110, Standard for Emergency and Standby Power SystemsNational Fire Protection Association